top of page
Search

Water Shutdown

  • jthier9
  • May 7
  • 1 min read

Hello everyone,


The Contractor will perform a water main connection on Ivy Lane. This water main connection will require a water shutdown tomorrow (5/8/2025) from 1pm to 5pm. Water will be turned off to the properties illustrated in the attached PDF. In addition to this post, door hangers will be handed out to properties affected by the water shutdown.


If anyone has any questions, please contact the project team.




 
 
 

Recent Posts

See All
Surfacing Warranty

Hello everyone, Tomorrow, the contractor will begin surfacing warranty repairs for work completed throughout the first year of construction. Please note that some sidewalk sections may be closed for s

 
 
 

Comments


Subscribe here to receive project updates to your inbox.

Thanks for subscribing!

City of Harrisburg Seal (Color).png

City of Harrisburg

 

(605) 743-5872

301 E Willow St.

Harrisburg, SD 57032

harrisburgsd.gov

Stockwell Engineers

(605) 338-6668

801 N Phillips Ave

Ste. 100

Sioux Falls, SD 57104

stockwellengineers.com

HARRISBURG SE INFRASTRUCTURE IMPROVEMENTS
PROJECT INFORMATION SITE

bottom of page