Oct 31, 20241 min read
Contact Information for Irrigation and Landscaping
Hi everyone, The previous update included an incorrect phone number for the landscaping and irrigation contractor. The correct number for...
85 views0 comments


ahutchings0
Oct 30, 20241 min read
Project Status
Hi everyone, Construction for 2024 will be wrapping up within the next few weeks. Here is a summary of the remaining work. Phase 1-3...
190 views0 comments


ahutchings0
Oct 24, 20241 min read
Schedule Update and Project Status
Hi everyone, Here is an updated project schedule, and since our last update, the Contractor has completed paving within Phase 3. Below is...
192 views1 comment


ahutchings0
Oct 18, 20241 min read
Maple Street Paving Completed
Hi everyone, The concrete crews have completed paving along Maple Street. The road will remain closed to traffic through next week. If...
156 views0 comments


ahutchings0
Oct 11, 20241 min read
Project Status
Hi everyone, Since our last update, the Contractor has installed most traffic signs, the majority of landscaping, and finished curb and...
232 views0 comments


ahutchings0
Oct 2, 20241 min read
Project Status
Hi everyone, Since our last update, the Contractor has completed most of the grading and topsoil installation along Perry Lane, and the...
210 views0 comments


ahutchings0
Sep 26, 20241 min read
Yard Restoration - Phase 1 and 2
Hi everyone, Construction crews have begun topsoil work south of Tiger Street, and will continue working north through Phase 1 and Phase...
172 views0 comments


ahutchings0
Sep 19, 20241 min read
Project Status
Hi everyone, Since our last update, the Contractor finished the underground installation along Maple Street and has begun installing...
248 views0 comments


ahutchings0
Sep 6, 20241 min read
Water Shutdown
Hi everyone, The Contractor will perform a water main connection near the intersection of Milwaukee and Maple on Monday (9/9). Water...
122 views0 comments
ahutchings0
Sep 4, 20241 min read
Perry Lane Update
Hi everyone, Perry Lane is now open to traffic and street parking. Please be aware of the temporary traffic signs at the intersections....
256 views0 comments


stockwellengineers
Sep 3, 20241 min read
Project Status
Hello all, Since our last update, the Contractor finished concrete sidewalk and driveway work along Perry Avenue as well as installed...
259 views0 comments


ahutchings0
Aug 28, 20241 min read
Schedule Update
Hi everyone! Here is the updated project schedule. Construction will stop for 2024 once Phase 3 has been completed, and the remaining...
250 views0 comments

stockwellengineers
Aug 16, 20241 min read
Grand Ave & Maple St Intersection Closure
Greetings: Starting on Monday, 8/19 the intersection of Grand Ave and Maple Street will be closed to vehicular traffic for the duration...
207 views0 comments


stockwellengineers
Aug 16, 20241 min read
Project Status
Hello all, Over the last couple weeks the Contractor finished street paving and started sidewalk and approach work along Perry Avenue....
281 views0 comments


stockwellengineers
Aug 14, 20241 min read
Water Shutdown
Hello all, Water will be turned off to the properties illustrated in the map below. The shutoff will occur either Thursday (08/15) or...
178 views0 comments

stockwellengineers
Aug 5, 20241 min read
Phase 3 Temporary Mailboxes
Hello all, Temporary mailboxes for Phase 3 residents are setup on Elm Street near the parking lot of the Harrisburg United Methodist Church.
172 views0 comments


lwittler
Jul 31, 20241 min read
Maple Street Closure & Project Update
Hello All, Starting Monday (08/05), Maple Street will close from Perry Lane west to the railroad tracks. The intersection of Grand Avenue...
313 views0 comments


stockwellengineers
Jul 24, 20241 min read
Concrete Paving
Hello all, Concrete Paving was completed today along Perry Lane between Tiger and Chestnut Street. The contractor is advising that no...
252 views0 comments
stockwellengineers
Jul 23, 20241 min read
Concrete Sawing
Hello All, As a reminder, concrete paving is underway on Perry Lane. Like all materials, concrete expands, contracts, and cracks. To...
308 views0 comments


stockwellengineers
Jul 22, 20241 min read
Project Status
Hello all, The Contractor has made steady progress over the last several weeks along the project. Roadway and concrete crews are onsite...